McKim & Creed was selected to provide infrastructure upgrades to the chilled water system, including evaluating current and future HVAC loads, assisting in new chiller selection, providing pumping/piping system modifications, and controls system optimization. The project also includes an emergency power system which consists of evaluating emergency power loads, building standby power needs, future building emergency, standby, and legally required power needs, in addition to a hot water system; inclusive of a new boiler, piping, pumping, and controls system upgrades.