McKim & Creed provided a study of the existing steam boiler plant that concluded all three boilers and associated equipment needed to be replaced.
McKim & Creed provided services for the installation of a 600 BHP high pressure steam boiler plant. At various locations, the steam pressure is reduced to serve the exact equipment and their steam load.
The replacement of 3 boilers required a phased removal design to maintain normal operations as all three existing boilers were replaced. Surge tank, deaerator and blowdown separators were replaced during the course of the project.